We are happy to inform our colleagues about the next Ekoton’s successful installation in Chile.

n 2017 the dissolved air flotation complex for local wastewater treatment of fish processing plant in Los Lagos region had been installed by our partner Aguas Sipra S.A., including such equipment:

  • Fine drum screen RMB TP 6/6,
  • DAF unit FT-25,
  • Tubular flocculator,
  • Saturation system for white water preparing,
  • Pumps for the complex,
  • Automation system for the complex, including control system with sensors.

koton DAF complex has customized design for the particular application. The object’s features required high amounts of dissolved air to be fed into wastewater to tackle high loads of contaminants. The complex’s capacity is 18 m3/h.

DAF Unit Installation Process

DAF Unit Installation process

The efficiency of the complex is as follows[1]:

Parameters

Input concentration, [mg/L]

Efficiency,

[%]

Output concentration, [mg/L]

Total suspended solids (TSS)

6,541

95

327

Biochemical Oxygen Demand (BOD5)

10,696

40

6,418

Nitrogen, Total Kjeldahi (NTK)

726

20

581

Oil and Grace (O&G)

975

90

98

Dissolved solids (DS)

81

60

32

In the result the customer got specially designed wastewater treatment system which is fully solves effluent requirements. In this project Ekoton confirms advantages if it’s developed DAF technology, as well as appropriateness of approach to use just the highest quality components available. Equipment operates steady well, which is really important for such a distant projects.